Spring Bluff R-XV Renovations & Additions


A. Eilers Construction partnered with Spring Bluff R-XV to complete a comprehensive renovation and addition project that transformed multiple areas of the school. The work included a new exterior restroom facility, a walk-in cooler addition, and a remodeled kitchen with epoxy flooring, new equipment, and improved storage. Both the large and small gyms received fresh paint, new flooring, bleachers, basketball goals, and wall pads, along with the installation of an 18’ overhead door to provide direct access from the small gym to the kitchen. A new nurse’s room with a private restroom was created to better serve student needs, while existing interior restrooms were modernized with updated ceilings, paint, plumbing fixtures, and partitions. Every classroom benefited from upgrades including new HVAC systems, paint, flooring, ACT ceilings, lighting, and electrical improvements. To enhance security, six new exterior FRP double doors with electronic card readers were installed. Together, these upgrades modernized the facility, improved functionality and safety, and created an updated, student-centered environment designed to serve the school community for years to come.

This six-month project was strategically scheduled to minimize disruption, with the majority of the work taking place over summer break in just two and a half months. Along the way, the team navigated challenges including necessary abatement across multiple areas of the school. Despite these obstacles, A. Eilers Construction successfully completed the project, and turned the building back over to the district in time for the new school year to begin.

An upscale, dimly lit restaurant interior with tables, bar seating, dark carpets, and decorative globe chandeliers.
June 29, 2026
Full renovation of the kitchen, bar, and dining areas, construction of new golf simulator bays, interior upgrades including new ceilings, walls, flooring, and millwork, new HVAC, electrical, plumbing, and fire protection systems, exterior improvements to the covered porch and patio with new stucco and aluminum storefronts, installation of commercial food service equipment and A/V technology, ADA accessibility upgrades and finish enhancements throughout. Through careful coordination and a focus on safety and cleanliness, our team executed this work without interrupting daily golf operations, allowing members to continue enjoying the course and club amenities while construction progressed behind the scenes. This 7,600+ square foot renovation includes both interior and exterior upgrades designed to elevate the guest experience and modernize key hospitality spaces.
A hotel reception area with a lit desk, modern pendant lighting, patterned wall panels, two armchairs, and wall art.
June 28, 2026
Ruth’s Chris asked A. Eilers Construction to provide minimal demolition and renovate an existing restaurant space. The project included minor wall demolition (25 lineal ft), construction of less than 20 lineal feet, a new interior wall, and minor ceiling adjustments.
A modern, curved control room with multiple computer workstations, wall-mounted monitors, and blue accent lighting.
June 27, 2026
Central County 911 director and board members requested for renovations of the existing two-story 911 headquarters building including new conference rooms, offices, training rooms, board room, restrooms, and new mezzanine level that entailed new ceilings, flooring, wall finishes, storefronts, new electrical, access control, A/V systems, new HVAC systems, fire sprinkler modifications, and plumbing. The project also included extensive scope for the new 911 Dispatch area that included new raised access flooring, new acoustical wall and ceiling finishes, and extensive A/V, access control, electrical, security upgrades and new backup generator. New exterior upgrades included new concrete sidewalks, stair and patio areas, canopies, railings and site drainage systems.
Show More
An upscale, dimly lit restaurant interior with tables, bar seating, dark carpets, and decorative globe chandeliers.
June 29, 2026
Full renovation of the kitchen, bar, and dining areas, construction of new golf simulator bays, interior upgrades including new ceilings, walls, flooring, and millwork, new HVAC, electrical, plumbing, and fire protection systems, exterior improvements to the covered porch and patio with new stucco and aluminum storefronts, installation of commercial food service equipment and A/V technology, ADA accessibility upgrades and finish enhancements throughout. Through careful coordination and a focus on safety and cleanliness, our team executed this work without interrupting daily golf operations, allowing members to continue enjoying the course and club amenities while construction progressed behind the scenes. This 7,600+ square foot renovation includes both interior and exterior upgrades designed to elevate the guest experience and modernize key hospitality spaces.
A hotel reception area with a lit desk, modern pendant lighting, patterned wall panels, two armchairs, and wall art.
June 28, 2026
Ruth’s Chris asked A. Eilers Construction to provide minimal demolition and renovate an existing restaurant space. The project included minor wall demolition (25 lineal ft), construction of less than 20 lineal feet, a new interior wall, and minor ceiling adjustments.
A modern, curved control room with multiple computer workstations, wall-mounted monitors, and blue accent lighting.
June 27, 2026
Central County 911 director and board members requested for renovations of the existing two-story 911 headquarters building including new conference rooms, offices, training rooms, board room, restrooms, and new mezzanine level that entailed new ceilings, flooring, wall finishes, storefronts, new electrical, access control, A/V systems, new HVAC systems, fire sprinkler modifications, and plumbing. The project also included extensive scope for the new 911 Dispatch area that included new raised access flooring, new acoustical wall and ceiling finishes, and extensive A/V, access control, electrical, security upgrades and new backup generator. New exterior upgrades included new concrete sidewalks, stair and patio areas, canopies, railings and site drainage systems.