Cycle Bar O’Fallon, MO


Xponential Fitness requested a tenant improvement for a CycleBar fitness studio, which included architectural renovations, MEP (mechanical, electrical, and plumbing) modifications, and structural adjustments as part of a design-build project.

A. Eilers Construction successfully completed the CycleBar O’Fallon, MO location on schedule, meeting all project milestones with precision and efficiency. Their performance not only ensured a smooth tenant improvement process—from demolition to final walk-through—but also led to the award of multiple additional CycleBar locations. This accomplishment reflects the team’s commitment to consistency, quality, and trusted client partnerships. The project stands as a strong example of what can be achieved through strategic planning, tight coordination, and focused execution. A. Eilers is proud to continue its relationship with the CycleBar/Xponential Fitness team.

An upscale, dimly lit restaurant interior with tables, bar seating, dark carpets, and decorative globe chandeliers.
June 29, 2026
Full renovation of the kitchen, bar, and dining areas, construction of new golf simulator bays, interior upgrades including new ceilings, walls, flooring, and millwork, new HVAC, electrical, plumbing, and fire protection systems, exterior improvements to the covered porch and patio with new stucco and aluminum storefronts, installation of commercial food service equipment and A/V technology, ADA accessibility upgrades and finish enhancements throughout. Through careful coordination and a focus on safety and cleanliness, our team executed this work without interrupting daily golf operations, allowing members to continue enjoying the course and club amenities while construction progressed behind the scenes. This 7,600+ square foot renovation includes both interior and exterior upgrades designed to elevate the guest experience and modernize key hospitality spaces.
A hotel reception area with a lit desk, modern pendant lighting, patterned wall panels, two armchairs, and wall art.
June 28, 2026
Ruth’s Chris asked A. Eilers Construction to provide minimal demolition and renovate an existing restaurant space. The project included minor wall demolition (25 lineal ft), construction of less than 20 lineal feet, a new interior wall, and minor ceiling adjustments.
A modern, curved control room with multiple computer workstations, wall-mounted monitors, and blue accent lighting.
June 27, 2026
Central County 911 director and board members requested for renovations of the existing two-story 911 headquarters building including new conference rooms, offices, training rooms, board room, restrooms, and new mezzanine level that entailed new ceilings, flooring, wall finishes, storefronts, new electrical, access control, A/V systems, new HVAC systems, fire sprinkler modifications, and plumbing. The project also included extensive scope for the new 911 Dispatch area that included new raised access flooring, new acoustical wall and ceiling finishes, and extensive A/V, access control, electrical, security upgrades and new backup generator. New exterior upgrades included new concrete sidewalks, stair and patio areas, canopies, railings and site drainage systems.
Show More
An upscale, dimly lit restaurant interior with tables, bar seating, dark carpets, and decorative globe chandeliers.
June 29, 2026
Full renovation of the kitchen, bar, and dining areas, construction of new golf simulator bays, interior upgrades including new ceilings, walls, flooring, and millwork, new HVAC, electrical, plumbing, and fire protection systems, exterior improvements to the covered porch and patio with new stucco and aluminum storefronts, installation of commercial food service equipment and A/V technology, ADA accessibility upgrades and finish enhancements throughout. Through careful coordination and a focus on safety and cleanliness, our team executed this work without interrupting daily golf operations, allowing members to continue enjoying the course and club amenities while construction progressed behind the scenes. This 7,600+ square foot renovation includes both interior and exterior upgrades designed to elevate the guest experience and modernize key hospitality spaces.
A hotel reception area with a lit desk, modern pendant lighting, patterned wall panels, two armchairs, and wall art.
June 28, 2026
Ruth’s Chris asked A. Eilers Construction to provide minimal demolition and renovate an existing restaurant space. The project included minor wall demolition (25 lineal ft), construction of less than 20 lineal feet, a new interior wall, and minor ceiling adjustments.
A modern, curved control room with multiple computer workstations, wall-mounted monitors, and blue accent lighting.
June 27, 2026
Central County 911 director and board members requested for renovations of the existing two-story 911 headquarters building including new conference rooms, offices, training rooms, board room, restrooms, and new mezzanine level that entailed new ceilings, flooring, wall finishes, storefronts, new electrical, access control, A/V systems, new HVAC systems, fire sprinkler modifications, and plumbing. The project also included extensive scope for the new 911 Dispatch area that included new raised access flooring, new acoustical wall and ceiling finishes, and extensive A/V, access control, electrical, security upgrades and new backup generator. New exterior upgrades included new concrete sidewalks, stair and patio areas, canopies, railings and site drainage systems.
Show More

Share this article